Talking Through Repair Estimates
These notes are written in the style of a short conversation between a teacher and a student. There is no audio and no real guest; the format simply makes a dry subject easier to follow.
Part one: why estimates go wrong
Student: I walked through a house last week and put the repairs at 25,000. An investor said it was nearer 60,000. How was I that far off?
Teacher: What did you price?
Student: Paint, flooring, a kitchen refresh, new fixtures.
Teacher: All the things you could see. What about the roof, the electrical panel, the plumbing, the foundation?
Student: I didn't really know how to judge those.
Teacher: That's the usual pattern. Beginners price what is visible and cheap and miss what is hidden and expensive.
Part two: what to do instead
Student: So should I just add a big number for the unknowns?
Teacher: Better to separate them. List what you saw and price it. Then list each major system with a note: looked fine, looked old, couldn't tell. For each "couldn't tell", write a range rather than a single figure.
Student: That makes the total a range too.
Teacher: Exactly. And it tells you what to have inspected first.
Part three: contingency
Student: What about contingency?
Teacher: It's an allowance for things nobody foresaw. Size it by how much you don't know. A house with a recent inspection needs less than one you saw for ten minutes.
Part four: sharing the estimate
Student: When I send the deal to investors, should I give my estimate?
Teacher: Give your range and say what scope it assumes, plus any inspection report. Let them form their own number. They will anyway.
Student: And with the seller?
Teacher: If repairs are why your offer is lower, explain which items drive it and admit what you're unsure about. Never inflate repairs to justify a low price.
Takeaways
| Point | Why |
|---|---|
| Separate visible from hidden | Hidden items cost the most |
| Use ranges | Honest about uncertainty |
| Size contingency to ignorance | Not a fixed percentage |
| Share scope assumptions | Buyers plan different work |
Part five: getting better
Student: How do I improve?
Teacher: Compare your estimates with inspection reports and contractor bids on practice houses. Keep a log. Learn which work in Texas needs licensed trades and permits. And ask contractors what surprises them.
Part six: a worked range
Student: Can you show me what a range looks like on paper?
Teacher: Hypothetically: cosmetic work you can see, 18,000 to 22,000. Roof, unknown age, 0 if sound and up to 12,000 if not. Electrical panel looked old, 0 to 3,000. Plumbing under the slab, unknown, 0 to 10,000. Contingency on top. The low total and the high total are far apart, and that gap is honest. It tells you the inspection is worth paying for before you rely on any single figure.