Illustrative Example: A Fully Disclosed Assignment
This is an illustrative example. The people, the property and every number are invented to teach the sequence of an assignment carried out with full disclosure. Nothing here describes a real deal or a typical result.
The assumptions
| Item | Assumption (hypothetical) |
|---|---|
| Property | Three-bedroom house, dated, roof near end of life |
| Seller | Seller A, owner-occupier relocating for work |
| Buyer under contract | Buyer B, a student doing a first deal |
| End buyer | Investor C, who renovates and resells |
| Estimated value after repairs | 240,000 (range 225,000 to 250,000) |
| Repair estimate | 45,000 (range 35,000 to 60,000) |
| Contract price | 140,000 |
| Assignment fee | 9,000 |
Step 1: The first conversation
Buyer B introduces themself as a buyer who may assign the contract to another investor and be paid a fee. Seller A asks what that means; Buyer B explains in two sentences and leaves a written note. Seller A says they will think about it and speak to a relative.
Step 2: The offer, explained
Buyer B walks Seller A through the numbers: three comparable renovated sales, the repair items seen, holding and resale costs, the investor's margin and the fee. Buyer B also says that listing with an agent after repairs might bring more money, but would need time and cash for the work. Seller A values speed because of the relocation date.
Step 3: The contract
The parties sign a contract with a closing in five weeks, an option period of a set number of days, a modest option fee, and earnest money with a title company. The contract expressly permits assignment, and Seller A initials that paragraph after Buyer B points it out.
Step 4: Marketing the position
Buyer B tells a small number of investors that they hold a contract and can assign it, sharing the comps, the repair notes and the seller's disclosure notice. Buyer B arranges one showing at a time Seller A agreed.
Step 5: The assignment
Investor C inspects, agrees with the general scope, and signs an assignment agreement. Investor C deposits fresh earnest money; Buyer B's deposit is to be reimbursed at closing.
Step 6: Closing
The title company prepares the statement. The fee appears as a buyer-side charge. Seller A, who already knew about it, is not surprised.
What made this example work
- The seller heard about assignment and the fee before signing.
- The numbers were shown as ranges with stated assumptions.
- The seller chose speed with knowledge of the alternative.
- Access for showings was agreed in advance.
What could have gone differently
If Investor C's inspection had found foundation problems, the repair figure would have risen sharply. Buyer B would then have had to return to Seller A with an honest explanation, or end the contract within the option period. That branch is explored in our what-if walkthrough.
Questions for discussion
- Was the fee proportionate to Buyer B's work and risk?
- What would you have told Seller A if they had not had a relocation deadline?
- Which document would you want a Texas attorney to review first?
This illustrative example is for general education only. It is not a model contract, and the figures are invented.